AfriCoast was appointed as specialist sub-consultant to CA du Toit (Eastern Cape) for the upgrade of the 105Ml/d Loerie WTW in phases.
Work undertaken by AfriCoast included:
- Process design
- Raw water supply pipe rehabilitation
- All new chemical and chlorine dosing systems
- All new lime dosing system comprising storage silo, day bins, wetting bowls and lime saturators
- Chemical storage
- Refurbishment of the clarifloculator settling tanks
- Refurbishment and upgrade of the rapid gravity filters, including replacement of the backwash pipework and pumps
- Upgrade of the sludge handling system
- New sand collection tank
- Cooling water pipework for the final water pumps
- Building maintenance, alterations and upgrades including new laboratory and plant control room
- New electrical intake substation building
- New motor control building for 3 x 2MW final water pump sets
- Road and site works