AfriCoast was responsible for all horizontal alignment, vertical alignment, drawings, bill of quantities and specifications for construction valued at 1.42 million

Tendering for the Design of Tabali-OK Pipeline: Bulk Water Pipeline in Thaba Nchu in the Free State Province. This pipeline was required to serve in conjunction with the existing bulk supply pipeline while allowing for future growth. The purpose of the new 600 mm diameter pipeline is to be a gravity water supply pipe line to the OK reservoir system.

Size and Capacity of the Pipeline

10km x 600mm diameter spigot and socket mild steel rising main with epoxy and associated pipeline chambers for in-line valves, air valves, scour valves and water meters. Cathodic protection to the pipeline and AC mitigation where crossing under Eskom power lines.

Africoast Consulting Engineers (Pty) Ltd in JV with Johan Vos Engineers (Pty) Ltd. (AfriCoast responsible for the pipeline alignment, drawings, BoQ and specification and JVE for the hydraulic analysis and tender document.