Tabali Water Main

Bloemwater appointed AfriCoast in joint venture with Johan Vos Engineers (Pty) Ltd for the design of a new 10km x 600mm diameter steel gravity pipeline (to be upgraded to a rising main at a future date) from the Tabali Reservoir to the OK Reservoir in Thaba Nchu in the Free State Province.

AfriCoast undertook all vertical and horizontal alignment design, specifications and bills of quantities for the pipeline and appurtenant structures.

Estimated construction value was R144,406,289 including VAT.