Binfield Water Treatment Works

Binfield Water Treatment Works

Binfield Water Treatment Works Amatola Water appointed AfriCoast as the consulting engineers to provide Professional Consulting Services for the Upgrade of the Binfield Water Supply Scheme (WSS). The Binfield WSS obtains raw water from the Binfield Park Dam and...
Bayworld Demolition

Bayworld Demolition

Bayworld Demolition The Nelson Mandela Bay Development Agency (NMBDA) is responsible for the redevelopment of the Bayworld aquarium complex. However, due to the aggressive conditions and severe state of decay, several portions of the complex were no longer safe and...
Unisa Sunnyside Campus re-development

Unisa Sunnyside Campus re-development

Unisa Sunnyside Campus re-development Africoast Consulting Engineers was appointed by the University of South Africa in Pretoria to oversee all civil and structural renovations for the Sunnyside South Campus which comprised of dilapidated properties including houses,...
The Beaches External Façade Repair

The Beaches External Façade Repair

The Beaches External Façade Repair AfriCoast Consulting Engineers (Pty) Ltd was appointed by the Body Corporate to carryout  inspections and investigations to the 20-storey The Beaches residential apartment block on the Port Elizabeth beachfront. Inspections carried...
Belafatima External Façade repair

Belafatima External Façade repair

Belafatima External Façade repair Trafalgar Property Management Pty Ltd engaged the services of AfriCoast Consulting Engineers to carry out a diagnostic survey investigation to the Belafatima Flats in Humewood, Port Elizabeth. This included a diagnostic survey to...