Kwazakhele Bulk Sewer

Kwazakhele Bulk Sewer Planning and Design of 1.5km long 1000mm dia Bulk Gravity Outfall...

Tabali Water Main

Tabali Water Main Design of 5km, 600mm dia Bulk Water Main with...
Augmentation of Markman Main Sewer Phase 3

Augmentation of Markman Main Sewer Phase 3

Augmentation of Markman Main Sewer Phase 3 The Augmentation of Markman Main Sewer Phase 3 entailed the construction of a 1000mm diameter HDPE lined reinforced concrete sewerage pipe from just beyond Settlers Bridge, the N2 crossing of the Swartkops River, to the Fish...

BAIC Fire Ring Main

BAIC Fire Ring Main Pumpstation, Reservoirs, and 3km long 350mm dia fire ring main, including Boring N2 and...