Kwazakhele Bulk Sewer The project is a re-design of the third phase of design and re-routing of Kwazakhele Main Sewer, crossing through Port Elizabeth’s Deal Party industrial area, the route to the Fish Water Flats Wastewater Treatment Works, has been under severe...
Tabali Water Main Bloemwater appointed AfriCoast in joint venture with Johan Vos Engineers (Pty) Ltd for the design of a new 10km x 600mm diameter steel gravity pipeline (to be upgraded to a rising main at a future date) from the Tabali Reservoir to the OK Reservoir...
Cape Receife Return Effluent Scheme The Cape Recife Waste Water Treatment Works (WWTW) had for years been supplying treated effluent to consumers for irrigation purposes. The treatment works had an existing return effluent (RE) scheme that services Nelson Mandela...
Augmentation of Markman Main Sewer Phase 3 The Augmentation of Markman Main Sewer Phase 3 entailed the construction of a 1000mm diameter HDPE lined reinforced concrete sewerage pipe from just beyond Settlers Bridge, the N2 crossing of the Swartkops River, to the Fish...
BAIC Fire Ring Main AfriCoast Consulting Engineers was the appointed civil engineering professional services provider for the planning, design and construction monitoring of a firing main from the fire reservoirs all the way to the BAIC factory, including crossing the...
Motherwell and Standford Pumpstation upgrades Africoast Consulting Engineers was appointed by the Nelson Mandela Bay Municipality for the civil and structural work for the improvement and installation of additional pump sets at Motherwell and Stanford Road booster...