Name of project: |
Scope of Services Provided: |
Date Service Provided: |
Project Value: |
Client Contact Person: |
Colchester Bulk Water Pipeline Upgrade |
Consultant in JV with SSI for the design, specification, contract documentation and construction management for a new 9,6km long bulk water pipeline varying in diameter from 600mm to 800mm. The construction of the pipeline was carried out by 10 learner contractors under the direct supervision and mentorship of the consulting engineers |
2006-2011 |
R65m |
Coega Development Corporation |
Loerie Water Treatment Works Upgrade (Phases 1- 5) |
Sub-consultant to CA du Toit (Eastern Cape) (Pty) Ltd for modernization and upgrade of the 100Mℓ/d Loerie Water Treatment Works. Responsible for process and detailed design, specifications, tender documentation, contract administration and construction monitoring for the chemical dosing systems, filters (including backwash pumps and blowers), and refurbishment of the clarifiers. |
2007 - 2015 |
R85m |
Nelson Mandela Bay Municipality |
Govan Mbeki Ave Bulk Sewer Rehabilitation |
Rehabilitation of live 1050mm & 525mm bulk sewers using trenchless methods. JV-appointment for planning, design, specifications and construction monitoring |
2009 - 2011 |
R11.5m |
Mandela Bay Development Agency |
Fishwater Flats emergency repairs of Kwazakhele Main Sewer |
Planning, design, specify, documentation, project management and construction monitoring for the repair of a collapsed 1200mm diameter sewer at the inlet to the Fishwater Flats Wastewater Treatment Works |
2012 - 2013 |
R20m |
Nelson Mandela Bay Municipality |
Nooitgedagt/Coega Low Level Supply Scheme |
Lead Consultant, Project Manager and Design Consultant for 140Mℓ/d additional water supply scheme to Nelson Mandela Bay Municipality. Project includes extensions to the Nooitgedagt WTW (2 x 70Mℓ/d modules), 42km x 1000mm to 1500mm diameter continuously welded steel rising and gravity mains, 10Mℓ and 45Mℓ storage reservoirs, 3 x bulk water pump stations with pumps of up to 800kW, cathodic protection to >100km of steel pipelines and rehabilitation of 500mm & 700mm diameter pipelines. AfriCoast was the Consultant for the planning, design and construction monitoring, with cathodic protection and pipeline rehabilitation of the WTW extensions and Olifantskop Reservoirs. |
2010 – current |
R1,05 billion |
Nelson Mandela Bay Municipality |
Coega Return Effluent Scheme |
Lead Consultant and Project Manager for scheme. The first phase of the project includes a new pump station at the Fishwater Flats WWTW, 15Mℓ storage reservoir, rising main of 26km x 950mm diameter continuously welded steel with four pipe bridges and 3km x 650mm diameter gravity main feeding into the Coega IDZ reticulation. In addition to being Lead Consultant, AfriCoast is the consulting engineer for the design and implementation of the rising main pipeline. |
current |
R450m |
Coega Development Corporation |
Nsezi Raw Water Pipeline |
Consultant for the planning, design and specifications, and construction monitoring for a second raw water pipeline from the Mhlathuze River weir pump station to the Nsezi WTW. Pipeline is 4km x 1500mm and 3.8km x 1200mm dia continuously welded steel. |
current |
R150m |
Mhlathuze Water |
Augmentation of Markman Main Sewer Ph 3 |
Planning, design, specification, documentation and contractor procurement for construction of a 1000mm diameter, HDPE-lined reinforced concrete sewer pipe from the Swartkops Bridge, across Fishwater Flats to the Wastewater Treatment Works, including flow diversion structures where the pipeline starts |
2007-current |
R37 981 117 |
Nelson Mandela Bay Municipality |