Project Management

Florida Heights Portion 6: Integrated Housing Development

Florida Heights Portion 6: Integrated Housing Development

Florida Heights Portion 6: Integrated Housing DevelopmentIn order to address the pressing housing shortage in the Nelson Mandela Bay Metropolitan Area, Sakhisizwe Renewable Energy identified and obtained land to develop an integrated housing development on Portion 6...

read more

Asset Management

The Beaches External Façade Repair

The Beaches External Façade Repair

The Beaches External Façade RepairAfriCoast Consulting Engineers (Pty) Ltd was appointed by the Body Corporate to carryout  inspections and investigations to the 20-storey The Beaches residential apartment block on the Port Elizabeth beachfront. Inspections carried...

read more
Nelson Mandela University Building Maintenance Programme

Nelson Mandela University Building Maintenance Programme

Nelson Mandela University Building Maintenance ProgrammeAfricoast Consulting Engineers was appointed by the Nelson Mandela University to conduct assessments of existing buildings across all NMU's different campuses with a view to compiling and managing the...

read more
Shark Rock Pier

Shark Rock Pier

Shark Rock Pier,,Shark Rock Pier, located between Hobie Beach and the Red Windmill, was constructed during 1988. The structure boasts a 137m long reinforced concrete pier and is at the very centre of the Port Elizabeth beachfront. It is a major landmark and drawcard...

read more

NMBM Reservoir Rehabilitation Programme

NMBM Reservoir Rehabilitation ProgrammeNMBM appointed AfriCoast as the Lead Consultant to conduct investigations into the conditions of the municipality's reservoirs, break pressure tanks and water towers and to provide reports based on the findings. Following the...

read more
Fishwater Flats WWTW Rehabilitation

Fishwater Flats WWTW Rehabilitation

Fishwater Flats WWTW RehabilitationThe Fishwater Flats Wastewater Treatment Works was constructed in 1976. A number of buildings and structures were identified as requiring maintenance and rehabilitation as part of the Maintenance Backlog Study undertaken for the...

read more
NMU Technical Assistance Programme

NMU Technical Assistance Programme

NMU Technical Assitance ProgrammeNelson Mandela University appointed AfriCoast to provide technical assistance for ongoing ad hock and emergency maintenance and rehabilitation works.

read more
NMU Concrete Rehabilitation programme

NMU Concrete Rehabilitation programme

NMU Concrete Rehabilitation programmeAfricoast Consulting Engineers was tasked by the Nelson Mandela University to assess the present state of concrete corrosion by means of a concrete durability survey of the reinforced concrete structures and to make recommendations...

read more